End to end installation services for compressor, pump, vessel, heat exchanger, reactor up to 25 ton (static) and 15 ton (rotary). Includes foundation prep, alignment, and grouting.
Full-cycle piping solution for carbon steel, stainless-steel and alloy. Capability up to 40,000 dia inches & support on Pre-com. & Commissioning
Specialized shutdown (TA) maintenance, heat exchanger maintenance, tube bundle pulling, ultra-high-pressure water jetting (up to 30,000 PSI), and flange management and bolt torqing.
Expert installation, replacement, and revamping of tray, packings ( Sulzer, Montz, KG ) and distributor. Confined- space certified teams.
Sludge & Debris Removal, waste containment
Manual cleaning / High-Pressure water jetting
As competency and well trained personnel by Hi-Force with Mechanical Joint Integrity Course
Provide HTW to achieve 0 leak
Provide JIT supervisor to supervise the work and bolt torqueing report
Fulfil DOSH packages requirement
Provide chart recorder with range (1,000Psi ~ 15,000Psi), (8hr / 24 hr mechanical clock)
Provide High Pressure Pneumatic Test Pump, Manifolds, Hoses, Fitting & Accessories
Offloading & Machinery Installation
Hydraulic Piping System Installation Works
Hydrostatic Testing for 210 Bar
Hydraulic Oil Flushing